Stewardship Ontario is showing two fee scenarios for stewards to provide them with some guidance for setting their 2015 budgets – Scenario 1 (paying to Best Practice Cost1) and Scenario 2 (paying to municipal reported net costs). These two scenarios are directional only and a finalized fee schedule will be provided to stewards as soon as possible following the release of the arbitrator’s decision. The 2015 fee schedule variances are shown from the 2013 fee schedule (the last approved fee schedule).
[1] Best Practice net cost as calculated using a Best Practice Cost Model developed to implement cost bands by a KPMG-led consortium at the request of MIPC (Municipal Industry Programs Committee) in 2007, and subsequently updated by MIPC.